Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Condenser installation



You might also be interested in

  • Image not available

    Long Beach Steam Station No. 2 and No. 3

    Visual Materials

    Condenser installation, stacks, south elevation poured, turbo installations, turbo room construction, boiler room construction, bricking the boilers, exterior shot complete with 8 stacks on Plant 2, control room. Piles placed for Plant 3 construction, moving above ground fuel storage tank by floating.

    photCL SCE

  • Image not available

    End of construction of Long Beach Steam Plant #1

    Visual Materials

    End of construction of Long Beach Steam Plant #1 - turbine installations, control rooms, transformers, cooling water system, plant start-up; and start of construction for Plant #2 - excavation, driving piles for Plant 2 foundation.

    photCL SCE 13 - vol 085

  • Long Beach Steam Station, Plant #3 - Installing condenser in Turbo Room

    Long Beach Steam Station, Plant #3 - Installing condenser in Turbo Room

    Visual Materials

    Long Beach Steam Station, Plant #3 - Installing condenser in Turbo Room.

    photCL SCE 02 - 15008

  • Long Beach Steam Station, Plant #1

    Long Beach Steam Station, Plant #1

    Visual Materials

    Long Beach Steam Station, Plant #1 - Construction crew bricking up the boilers during the construction of Long Beach Steam Plant.

    photCL SCE 02 - 00480

  • Long Beach Steam Station, Plant #1

    Long Beach Steam Station, Plant #1

    Visual Materials

    Long Beach Steam Station, Plant #1 - A construction crew working on bricking up the boilers at the Long Beach Steam Plant.

    photCL SCE 02 - 00474

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.

    photCL SCE