Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Hoover Dam



You might also be interested in

  • Image not available

    Hoover Dam ceremony, aerial views, etc

    Visual Materials

    Hoover Dam, ceremony, Lake Mead, aerials of Colorado River, Transmission Towers, Generator floor, Transformers, assembly of units.

    photCL SCE

  • Big Creek - Powerhouse #1 (part 1)

    Big Creek - Powerhouse #1 (part 1)

    Visual Materials

    Big Creek - Powerhouse #1 (part 1) [PH 1 Scenic, generator floor, exterior with extension, generator repairs, Unit 3 penstock construction, riveting penstock, transformer rack, substation, exterior before extension, extension construction, hoist house interior, assembly of Units 3 & 4, change to 220 kV transformers.]

    photCL SCE 13 - vol 027

  • Image not available

    Big Creek: Powerhouse No. 1 (part 1)

    Visual Materials

    Photographs of Powerhouse No. 1, Part One. Views include generator floor, exterior with extension, close-up of Powerhouse 1, generator repairs, Unit 3 penstock construction, riveting penstock, transformer rack, substation, exterior before extension, extension construction, hoist house interior, assembly of Units 3 and 4, change to 220 kV transformers.

    photCL SCE

  • Big Creek - Powerhouse #3 (part 2)

    Big Creek - Powerhouse #3 (part 2)

    Visual Materials

    Big Creek - Powerhouse #3 (part 2) [Generator floor with Units 1, 2, & 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Powerhouse #1 - penstock construction for Unit 3.]

    photCL SCE 13 - vol 033

  • Kern River #1

    Kern River #1

    Visual Materials

    Kern River #1 - site for Democrat Dam, dam construction and drainage tower, intake, dam spilling, construction at Camp 4, flume, Kern River Canyon, Hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles, Camp 1, penstock construction, branch pipes, powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel & buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line, Tejon, Castaic & Fernando Substations, L. A. #3 steam plant...

    photCL SCE 13 - vol 063

  • Big Creek - Powerhouse #3 (part 1)

    Big Creek - Powerhouse #3 (part 1)

    Visual Materials

    Big Creek - Powerhouse #3 (part 1) [first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.]

    photCL SCE 13 - vol 032